Skip to content

Scheduled enrichment

Re-run an enrichment column on a recurring schedule.

Create a schedule from the column

Open the enrichment column in its Sheet and choose the scheduling option. Select a cadence, local time, and time zone. The schedule uses the column’s current prompt and configured context, so finalize those before you automate it.

Monitor each run

The Automations page lists the Sheet, column, cadence, next run, and a history for each job. Expand a job to inspect its recent outcomes. A run can be completed, skipped, pending, dispatched, or failed; these states describe the run rather than a promise that every row received a value.

Change safely

To change the research task, update the column configuration first. Remove a schedule from the job’s action menu when it is no longer needed. Removing it stops future occurrences; it does not erase results already written to the Sheet.